Have the ability to run two parallel operations that share some items but not others.
My dad and I run two financially separate farms that share equipment and storage locations. There doesn't seem to be any way to set this up in the crop plan. I don't want to have to have an entirely different data file for his stuff.
Hi, a potential option could be to name fields uniquely to the operation. Outside of that, we do not have any current options.